The record high level of component lead times in the second half of 2018 is showing some signs of coming back down with a drop of 5% since Q3. In Q3, a study by Future Electronics showed, among other unprecedented levels of shortage, LV MOSFETs at an astonishing 39-52 weeks lead-time from Infineon and Fairchild, ...
This story continues at Have Lead-Times Peaked?
Or just read more coverage at Electronics Weekly
from News – Electronics Weekly http://bit.ly/2F2wPcM
via Yuichun
沒有留言:
張貼留言