2022年9月22日 星期四

Anchor ready for 300kW wave energy buoy

The first anchor has been installed for CorPower’s 9m diameter 300kW C4 wave power converter. The custom anchor, dubbed Umack, has been installed 4km off the coast of northern Portugal at Aguçadoura, where the giant buoy will be part of the HiWave-5 wave power demonstration project. C4 generates power by bobbing up and down along ...

The post Anchor ready for 300kW wave energy buoy appeared first on Electronics Weekly.



from | Electronics Weekly https://ift.tt/NlRTxiH
via Yuichun

沒有留言:

張貼留言