2017年3月24日 星期五

TSMC to start installing equipment at Nanjing fab in 2H17

Equipment move-in will take place at Taiwan Semiconductor Manufacturing Company's (TSMC) Nanjing plant in the second half of 2017, according to Roger Luo, president for TSMC Nanjing. The new 12-inch facility is set to begin pilot production in the first half of 2018 followed by volume production in the second half of the year, said Luo.

from DIGITIMES: IT news from Asia http://ift.tt/2nXJ6mZ
via Yuichun

沒有留言:

張貼留言